Skip to content
Pakistan Towing Services logo

Car recovery near Chinarkot Toll Plaza, M-15

Chinarkot Toll Plaza is on the two-lane northern section of the Hazara Motorway between Mansehra and Battagram, in the Battal area. The road here winds through steep, forested hills with tunnels nearby.

  • Toll plaza near Battal
  • Roughly km 135 from the Hazara Interchange (M-1, near Burhan) end
  • Open 24/7, both directions
  • Fixed quote before dispatch

Request a recovery truck

What happened?

You get a fixed price and arrival time before any truck leaves.

Recovery truck behind a broken-down car on a Pakistani motorway in the hills at dusk
Recovery around Chinarkot Toll Plaza, day and night

Telling us where you are

With oncoming traffic and limited shoulders, a breakdown here needs hazards on, a warning triangle well behind the car and an early call.

  • Tell us your direction: towards Thakot or towards Hazara Interchange (M-1, near Burhan).
  • Read the nearest kilometre marker on the hard shoulder; Chinarkot Toll Plaza is at roughly km 135 from the Hazara Interchange (M-1, near Burhan) end.
  • If you've passed Chinarkot Toll Plaza, say whether you're nearer Mansehra Interchange or Kuzabanda Toll Plaza.
  • Send a WhatsApp live location pin if you have signal; it's the fastest way to find you.

Around Chinarkot Toll Plaza

Towards Hazara Interchange (M-1, near Burhan)
Mansehra Interchange, about 40 km
Towards Thakot
Kuzabanda Toll Plaza, about 20 km
Nearest service area
Dangari Service Area, about 50 km
Nearest city
Battal

About the M-15

  • North of Havelian the road climbs and descends through the Hazara hills. Use a low gear on long descents and let the engine hold your speed instead of riding the brakes.
  • Do not stop inside a tunnel unless the car will not move. If it does, switch on hazards, keep your headlights on, and walk to the nearest exit or emergency point away from traffic.
  • The section north of Mansehra towards Battagram and Thakot is a two-lane road with oncoming traffic. Overtake only where you can see well ahead, and expect snow and ice on higher ground in winter.
  • Monsoon rain can bring landslides and rockfall on cut slopes. Avoid stopping beneath loose ground, and if you break down, use the hard shoulder or a lay-by with hazards on and a warning triangle behind the car.

Questions

Do you provide recovery near Chinarkot on the M-15 24/7?

Yes, around the clock in both directions, Hazara Interchange (M-1, near Burhan) to Thakot.

What's near Chinarkot?

Chinarkot Toll Plaza is a toll plaza near Battal. The previous point towards Hazara Interchange (M-1, near Burhan) is Mansehra Interchange. The next towards Thakot is Kuzabanda Toll Plaza.

How do I tell you exactly where I am?

Read the nearest kilometre marker on the hard shoulder; Chinarkot Toll Plaza is at roughly km 135 from the Hazara Interchange (M-1, near Burhan) end.

How much will recovery cost?

It depends on where you are, your vehicle and where the car is going. You get one fixed price before we dispatch.

Stuck near Chinarkot Toll Plaza? Call us.

Any city, any motorway, any hour. Send your location and we'll send a truck.